

Project 01
Agni Steels · Fume Extraction System
2013 · 80 T fabrication in Coimbatore · 110 T complete erection in Port Elizabeth, South Africa.
View case study →
Project 02
Aquasub Engineering · Unit V Foundry
Fabrication project for Aquasub Engineering Unit V Foundry, represented in the archive by a fabricated industrial assembly.
View case study →
Project 03
JS Auto Cast Foundry India Ltd · Perundurai
2019 – 2020 · 400 T fabrication · 120 T DISA equipment · 520 T total erection.
View case study →
Project 04
Heavy Fabrication
Large fabricated industrial assembly from our project archive, showing customer-specific fabrication and heavy handling.
View case study →
Project 05
Dust Extraction System
Fabricated dust-extraction and air-handling equipment with associated ducting and structural support work.
View case study →
Project 06
Site Erection
Fabricated vertical structure being lifted and positioned during site erection work.
View case study →Request for quotation
Have a fabrication requirement?
Send the drawing package, specifications and execution scope for review.